The Joule Hotel project involved the restoration of this 10 story, 129 room, 1920’s neo-gothic landmark. Complete renovation included the addition of Charley Palmer’s Steakhouse. The contract was completed January, 2008. TAB Technologies was contracted to perform all air and
Infineon Technologies(Qimonda)
Project included a new 650,00 square foot semiconductor fabrication facility, a major central plant, and a new Probe, Assembly & Test building in Richmond, Virginia. Completed spring of 2005. TAB Technologies, together with joint venture partner US Test & Balance,
Omni Hotel
A new 4 star, 30 story hotel/condo structure located in Fort Worth, Texas. The hotel phase opened January 2009, with the completion of the condo phase in the summer of 2009. TAB Technologies was contracted to balance the air and
Hilton Convention Center
New 32 floor, 4 star hotel and condominium facility in Austin, Texas. Project completed in spring 2004. TAB Technologies performed the air and hydronic Test and Balancing services for the HVAC systems. Also acted as the Owner’s liaison in commissioning and
AMD Lonestar
A new 58 acre, 870,000 square foot, 5-building data center/office complex consisting of 4-story buildings with associated parking garages located in Austin, Texas. Completed in the spring of 2008. TAB Technologies performed the air and hydronic balancing in each building
Microsoft Data Center
An expansive 2-phase data center located in San Antonio, Texas. Completed in November of 2008. TAB Technologies performed the air and water balancing on the equipment per the specifications. The air systems contained both constant and variable volume units with
Leander Independent School District
This project encompassed three new elementary schools, a new high school complex and miscellaneous revisions on a middle school located in Leander and Cedar Park, Texas. The projects were completed in the December, 2008. TAB Technologies performed the air and
Government Projects
New University High School
TAB Technologies provided air and water balancing services in addition to a design review and HVAC commissioning services. The project included a significant chilled and hot water plant in addition to numerous conventional rooftop packaged units.