A new 337,000 square foot mammalian cell culture manufacturing facility located in Frederick, Maryland. Completed in December, 2009. This facility won the ISPE Facility Of The Year award in 2011. TAB Technologies was contracted by Fluor to help complete the
JW Marriott Resort and Convention Center
A new 4 star, 1,006 room hotel and 285,000 square foot convention center located in San Antonio, TX. Completed in March, 2009. TAB Technologies was contracted to balance the air and water per the specifications. The air side incorporated massive
San Antonio Miltary Medical Center
A massive new 825,000 square foot hospital, and 350,000 square foot phased hospital renovation located in San Antonio, Texas. Includes 425 inpatient beds (116 of those being ICU), 32 O.R.s and numerous departments including the U.S. Army Institute of Surgical
Infineon Technologies(Qimonda)
Project included a new 650,00 square foot semiconductor fabrication facility, a major central plant, and a new Probe, Assembly & Test building in Richmond, Virginia. Completed spring of 2005. TAB Technologies, together with joint venture partner US Test & Balance,
Hilton Convention Center
New 32 floor, 4 star hotel and condominium facility in Austin, Texas. Project completed in spring 2004. TAB Technologies performed the air and hydronic Test and Balancing services for the HVAC systems. Also acted as the Owner’s liaison in commissioning and
AMD Lonestar
A new 58 acre, 870,000 square foot, 5-building data center/office complex consisting of 4-story buildings with associated parking garages located in Austin, Texas. Completed in the spring of 2008. TAB Technologies performed the air and hydronic balancing in each building
Microsoft Data Center
An expansive 2-phase data center located in San Antonio, Texas. Completed in November of 2008. TAB Technologies performed the air and water balancing on the equipment per the specifications. The air systems contained both constant and variable volume units with
Leander Independent School District
This project encompassed three new elementary schools, a new high school complex and miscellaneous revisions on a middle school located in Leander and Cedar Park, Texas. The projects were completed in the December, 2008. TAB Technologies performed the air and
Scott & White Clinic
A new 3-story clinic and medical office building in Round Rock, Texas. The project was completed November of 2006. TAB Technologies scope of work consisted of balancing two roof mounted direct expansion air units. Space temperature was maintained via DDC
Sid Petersen Regional Medical Center
A new multi-story medical facility located in Kerrville, Texas. The project was completed in August 2008. TAB Technologies was engaged to perform the air and water balance testing in connection with the new hospital. The project included chillers with a