TAB Technologies currently has a contract for any Humble ISD building which needs Testing, Adjusting and Balance. We have completed scopes of work that include new construction, renovation, and additions. New Construction included complete balance of air and water systems,
Conroe ISD
A current contract for any Conroe ISD building which needs Testing, Adjusting and Balance. We have completed scopes of work that include new construction and additions. New Construction included complete balance of air and water systems, and verification of controls.
Houston Community College – Northline Campus
The Northline Campus is a new four-story academic building totaling about 116,500 square feet. It is equipped with two math computer labs, two biology labs, one chemistry lab, one business technology lab, a cosmetology lab, a computer drafting lab and
Chevron Phillips – Cedar Bayou Plant
Cedar Bayou plant is a petrochemical manufacturing facility located in Baytown, Texas. It is the largest U.S. manufacturing facility of Chevron Phillips Chemical Company. This project was completed in September of 2017. TAB Technologies was contracted to test and balance
Texas A&M University – Galveston Academic Building Phase 1
A new 5-story educational facility located in Galveston, Texas on the Texas A&M campus. TAB Technologies performed the air and water balancing on the equipment per the specifications. The air systems contained OAHU’s, AHU’s and terminal units (some with heating
Houston Marriott Marquis
A new 5 star, 30 stories, 1,000 room, 1,000,000 square foot convention center hotel located in Downtown Houston, TX. Completed in 2017 just in time for Super Bowl LI. TAB Technologies was contracted to balance the air and water per