A new 337,000 square foot mammalian cell culture manufacturing facility located in Frederick, Maryland. Completed in December, 2009. This facility won the ISPE Facility Of The Year award in 2011. TAB Technologies was contracted by Fluor to help complete the
JW Marriott Resort and Convention Center
A new 4 star, 1,006 room hotel and 285,000 square foot convention center located in San Antonio, TX. Completed in March, 2009. TAB Technologies was contracted to balance the air and water per the specifications. The air side incorporated massive
San Antonio Miltary Medical Center
A massive new 825,000 square foot hospital, and 350,000 square foot phased hospital renovation located in San Antonio, Texas. Includes 425 inpatient beds (116 of those being ICU), 32 O.R.s and numerous departments including the U.S. Army Institute of Surgical