The Northline Campus is a new four-story academic building totaling about 116,500 square feet. It is equipped with two math computer labs, two biology labs, one chemistry lab, one business technology lab, a cosmetology lab, a computer drafting lab and
Texas A&M University – Galveston Academic Building Phase 1
A new 5-story educational facility located in Galveston, Texas on the Texas A&M campus. TAB Technologies performed the air and water balancing on the equipment per the specifications. The air systems contained OAHU’s, AHU’s and terminal units (some with heating