A new 5 star, 30 stories, 1,000 room, 1,000,000 square foot convention center hotel located in Downtown Houston, TX. Completed in 2017 just in time for Super Bowl LI. TAB Technologies was contracted to balance the air and water per
JW Marriott Resort and Convention Center
A new 4 star, 1,006 room hotel and 285,000 square foot convention center located in San Antonio, TX. Completed in March, 2009. TAB Technologies was contracted to balance the air and water per the specifications. The air side incorporated massive
Joule Hotel
The Joule Hotel project involved the restoration of this 10 story, 129 room, 1920’s neo-gothic landmark. Complete renovation included the addition of Charley Palmer’s Steakhouse. The contract was completed January, 2008. TAB Technologies was contracted to perform all air and
Omni Hotel
A new 4 star, 30 story hotel/condo structure located in Fort Worth, Texas. The hotel phase opened January 2009, with the completion of the condo phase in the summer of 2009. TAB Technologies was contracted to balance the air and
Hilton Convention Center
New 32 floor, 4 star hotel and condominium facility in Austin, Texas. Project completed in spring 2004. TAB Technologies performed the air and hydronic Test and Balancing services for the HVAC systems. Also acted as the Owner’s liaison in commissioning and
Reunion Tower
Reunion Tower is Dallas’ most recognized landmark; adjacent to the Hyatt Regency and the restored Union Station (also a TAB project). Complete renovation included the addition of Wolfgang Puck’s Five Sixty restaurant. The contract was completed January 2009. TAB Technologies
Great Wolf Lodge
Great Wolf Lodge is a hotel/indoor water park facility located in Grapevine, Texas. Phase 1 was completed in March of 2008 and Phase 2 was completed in November 2008. TAB Technologies was contracted to perform the air and water balance